Safety system status and details of Drills at Dalli mechanized mine

 Safety system status  and details of  Drills at Dalli mechanized mine status of fleet and date of commissioning of  Drills at Dalli mechanized mine

list of equipment's with date of commissioning

Image
 following is the list of equipment maintained at Dalli mechanized mine: Total machines 40: (departmental 23, MARC 17) Dumpers 8 number (120, 121 are under survey off) and 125 converted into tanker excavators : 10 in numbers ( Be13 is under survey off) Dozers: 6 in numbers (39 under survey off) water sprinklers : 3 in numbers (including dumper 125) drill machines : 5 in numbers  service vehicles: 6 numbers

Safety system status and details of Dozers at Dalli mechanized mine

Image
 Safety system status of Dozers of Dalli mechanized mine fleet of dozers at Dalli mechanized mine with date of commissioning and current HMR:

Safety system status and details of Excavators of Dalli Mechanized mine

Image
Safety system status of Excavators of Dalli mechanized Mine Current equipment status  of excavators of Dalli mechanized Mine  Safety system status of Excavators 

Compressor air vessel test certificate and vital data

Image
 EMM garage inside pressure vessel compressor receiver tank small : test certificate EMM garage outside shed pressure vessel:  Outside shed : big pressure vessel test certificate

Recent Brake testing record and running details of Wheeled equipment

Image
Recent brake testing record of dumpers and other vital data